Removing rivets to release the right hand cylinder cover on Sir Frederick Pile. #Shorts Southern Locomotives Ltd Channel 470 подписчиков Скачать
Chamfering new frame extensions for Sir Fred Pile while Allan cuts Brocklebank Line wasted extension Скачать
Continuing removal of paint on the inside of the frames of Sir Frederick Pile 5 November 2024 Скачать
Removing the bolts from the weighshaft to enable dismantling and lifting from Sir Frederick Pile Скачать
Liam grinding rivets on Brocklebank Lines as result of water ingress between frames and extensions Скачать
Lawrence removing half a dozen of Norman’s copper stays for inspection by the boiler inspector. Скачать
34072 as 34066 Spitfire at the Spa Valley Railway 10 feb 2024 #railway #train #spitfire #spa valley Скачать