Helicon Project: Polyurethane Grout: Maximo Marina, St. Petersburg, FL
Client: Maximo Marina
Market: Commercial
Project: Maximo Marina is a marina located in St. Petersburg, Florida. The structure is comprised of a one-story commercial office building with amenities located on the water. The office building was experiencing settlement from soil erosion caused by the incoming and outgoing tide. The client's interest was to quickly preserve and make the office building safe. Their long-term plan is to eventually build a new office building. Foundation repair and ground improvement utilizing a one-part permeation and two-part poly foam chemical grout were specified to support the building loads and seal the exterior foundation.
Challenge: The foundation work presented several challenges: Completing interior and exterior work while office staff and marina remained open. Tight confined workspaces inside the office building Setting up containment barriers to catch any chemical grout that may enter the water Environmentally friendly chemical grouting needed due to proximity to water
Solution: A chemical grout plan was designed to meet the design load criteria, fill voids and seal the exterior foundation of the building. Helicon's chemical grout crew worked over a 3 day period to complete this project. Efficient planning & coordination was key to overcoming any challenges and limitations. 25 .±. gallons of one-part permeation grout injected into a total of thirty-five (35) grout points along the interior perimeter of the west end of the of the structure. A total of 2,451.3 .±. pounds of two-part chemical grout was injected into a total of thirty-eight (38) points in the interior of the west end of the structure. The project was finished on-time and within budget.
Technical Details:
Polyurethane Chemical Grouting is one of the best ways to remediate weak, shallow soils or to fill voids under weakened structures and slabs. The injection rods are penetrated through holes the size of a nickel. The rods are typically spaced in a 5-foot grid pattern over the treatment area. The expanding polyurethane foam is injected under high pressure as the rods are raised from the deepest point to the surface. Helicon is also able to realign weakened foundations by gently raising the foundation upward, stabilizing while densifying loose soils. The degree of lift is a controlled and precise operation that requires experienced Polyurethane Chemical Grouting professionals.
For more information please visit www.heliconusa.com or call 844-HELICON.
Chemical Grout
Injection
Poly Foam
Pressure
Marina
Seawall
St. Petersburg, FL
Ещё видео!