Singapore Changi Airport Introduces its latest addition Terminal 3. Voted as one of the Singapore Changi Airport Terminal 3 finally starts operations.
Singapore Changi Airport's new Terminal 3 finally commenced operations in January 2008 after years of anticipation and S$1.75 billion. Designed by CPG Corporation and Skidmore, Owings and Merrill LP, the 380,000-square-metre building is located directly opposite Terminal 2.
The T3's most outstanding feature is a unique butterfly roof architecture which allows soft natural light into the building while keeping the tropical heat out. At night, the skylights glow with artificial lighting that is delicately concealed below the reflector panels.
Ещё видео!