Work Description for Mould Replacement
1. Project Title:
Replacement of Hollow Mould with Bricks Mould
2. Scope of Work:
This task involves the removal of the existing hollow mould and installation of a bricks mould in the production line/machine setup. The work ensures smooth functionality and production efficiency with minimal downtime.
3. Steps Involved:
1. Preparation:
Ensure all safety protocols are in place.
Disconnect power supply to the machine and lockout/tagout as necessary.
Gather tools and equipment for mould replacement.
2. Hollow Mould Removal:
Loosen bolts, clamps, and fasteners securing the hollow mould.
Safely detach and remove the hollow mould from the machine.
Clean the machine surface and check for wear or damage.
3. Installation of Bricks Mould:
Position the bricks mould accurately on the machine setup.
Secure it using appropriate bolts, clamps, and fasteners.
Align the mould to ensure proper operation.
4. Testing and Calibration:
Reconnect the power supply and perform a trial run.
Check for alignment, performance, and production quality.
Adjust settings as needed for smooth operations.
5. Final Inspection:
Inspect the installed bricks mould for stability and functionality.
Ensure all components are securely fixed and operational.
4. Materials and Tools Required:
Spanners and wrenches
Cleaning supplies
Lubricants (if needed)
Safety gear (helmets, gloves, etc.)
5. Timeline:
The mould replacement task is expected to be completed within [insert timeline, e.g., 4-6 hours].
6. Safety Measures:
Follow standard operating procedures (SOPs).
Ensure no personnel are near moving machinery during testing.
Use appropriate personal protective equipment (PPE).