#polavaram,#andhrapradesh,#meil
Polavaram - The world’s largest flood water control gate system | Megha Engineering and Infrastructures Ltd (MEIL)
-------------------------
The main aim of the Polavaram project is to stop the Godavari flood merging with the sea and make the state prosperous. MEIL bagged the project in the reverse tendering process by saving Rs 838.51 crore to the exchequer. MEIL is executing the works as per the engineering manual and according to the plan. The works are going on at a brisk pace according to the action plan. The state government is able to get the long-pending approvals for designs from the Central Water Commission (CWC).
------------------------
► Subscribe to: [ Ссылка ]
► Like us on Facebook: [ Ссылка ]
►website: [ Ссылка ]
-----------------------
Megha Engineering & Infrastructures Limited (MEIL) is a major infrastructure company headquartered in Hyderabad, India. The company was established in 1989 as a small fabrication unit. In due course of time, the unit made a name for itself. We are fired by the zeal to equip the country with an engineering and infrastructure foundation that can hold up its pillars for generations to come.
---------------------------
Polavaram - The world’s largest flood water control gate system
Теги
meilpolavarampolavaram projectstory of polavarampolavaram project details in teluguysrandhra pradeshpolavaram updatesmeil projects in apmeil polavarampolavaram videospolavaram project drone viewpolavaram project latest videos 2020polavaram project full details in teluguappolavaram gatespolavaram gates fittingpolavaram gate fixingmeil videosThe world’s largest flood water control gate systemworld’s largest flood water control gate