Geodesign Flood Barrier Installation in 4 Steps
Heavy Duty Series, 4 ft (1.22 m) tall, installed by 2 men. No tools. No anchors.
1. Place, Unfold & Lock Steel Supports
2. Connect Supports with Link Bars
3. Mount Aluminum Panels
4. Line with Membrane
5. Installed!
This setup of Geodesign's Heavy-Duty 4 ft Flood Barrier was done by two men outside one of Geodesign's storage hubs in Hobe Sound, Florida.
![](https://s2.save4k.org/pic/47tkVkD9M4U/maxresdefault.jpg)