Crane checklist (relevant for MODUs) :
• Record the date of the last crane diesel engine overhaul.
• Check the date of the last slewing brake test.
• Ensure that the aircraft warning lights in the boom and A-frame are working (API Spec 2D appendix C).
• Ensure a windsock is fitted.
• Check the condition of the A-frame ladders.
• Check the certification of the wires: boom, main and whip wire.
• Check the date of the last load test (Classification Society, Lloyd’s Register, ABS, and DNV).
• Check the last load test by Class (up to 20 tons: SWL plus 25%: from 20 to 50 tons: SWL plus 5 tons: above 50 tons: SWL plus 10%).
• Ensure load cell management and radius/weight alarms are installed and working satisfactorily.
• Verify that NDT inspections of the pedestal, crane boom and blocks are part of the lifting- gear surveys.
• Verify that four-yearly NDT inspections of the slewing (bearing) bolts are carried out (internal and external). Some rig crews do 25% yearly.
• Function-test the high limit switches of the main and whip line, and the high and low limit switches of the crane boom (API Spec 2D app C Section 4.1.2d).
• Verify that only safety glass is used for the crane cabin windows (API Spec 2C Section 12.2).
• Check the records of the last boom pin NDT inspections (API Spec 2D Appendix C).
• Verify that the crane control handles return to the centre position when released (API Spec 2C Section 11.1.2).
• Check the operation of the wire drum braking systems (API Spec 2C Section 8).
• Verify that the friction brakes are fitted with rain guards (API Spec 2C Section 13.3).
• Verify that the sheave sizes are no less than eighteen times the diameter of the wire rope (API Spec 2C Section 7.4.1.1).
• Verify that there is a load chart in the crane cabin (API Spec 2C Section 4.2).
• Verify that an emergency stop for the crane engine is available, that it is operated from the crane cabin and is in working condition.
• Check the correct installation of wedge-type sockets, paying particular attention to the wire clamps (API Spec 2C Section 7.3.3).
• Verify the land rig crane procedures: only allow lifting when the support legs are extended and secured.
• Check that there is a procedure to ensure that land rig cranes are not allowed to move while there is a lift hanging in the crane.
• Note some cranes are now built to lift and carry.
• Land rig cranes require to follow the rules and requirements of the local authorities and the drilling contract.
Offshore Crane Operator Safety #Rig_Inspection_Workshop
Теги
Offshore CraneOffshore Crane Operator Safetycrane operatoroil rigoffshore crane operationsoffshore crane incidentoffshore crane inspectionoffshore crane liftingoffshore crane accidentsoffshore crane operator trainingoffshoreoffshore crane operator courseoffshore crane operator stage 1offshore crane operator stage 3offshore crane operator certificatecrane operator offshore malaysiaoffshore oil rig crane operatoroffshore crane operator stage 2