This is my 1974 R90/6 at idle after it has warmed up. So far I have:
Installed new battery
Adjusted the valve clearances and cylinder head nut torque
Adjusted the ignition timing
Replaced the points and condenser
New value cover gaskets
New brushes on alternator
Disassembled the carburetor and cleaned the jets
Balanced and adjusted the carburetors idle and mixture
Removed the existing gas tank liner and replaced it with new Por 15 Liner
Installed brake pads, front and back
Installed new Corbin seat
Installed new Metzler tires
Installed new Hagon rear shocks
Replaced the foot pegs, front and back
Replaced steering dampener knob
Ещё видео!