The inlet gate is a latent gate. After molding, the excess part needs to be punched off.
Before improvement: After the injection molding is completed, manually cut off the excess part with cutters;
After improvement: Matching with the injection manipulator, a mold product can be directly placed on the punching equipment and washed away. The product is sucked by the manipulator and placed on the conveyor belt. Excess waste, falls into the waste bin.
Save people (save 1 person/shift, 2 people/day) and improve efficiency.
Design and Manufacturing Factory, Whatsapp: +86 13620966364
Ещё видео!