5th of July 2013, Harbor Gdynia area. Transportation of steel service deck for Hardangerfjord Bridge, Norway. The construction's dimensions including the truck and trailer reached 25m length, 5.5m width and ultra-height of 6.3m.
Transportation required temporary suspension of railway traffic as well as an operation of lifting the power cables. For this purpose two special PKP trains were engaged.
There were 2 drivers and 4 pilots involved in the entire action and they were additionally supported by 2 technical vehicles with teams responsible for disassembling traffic lights.
Ещё видео!