Welcome To Everyone On Channel
Pakistan Trainz Present Full Train Journey Of Orange Line Metro Train Lahore. I Travel From Dera Gujran To Ali Town In Orange Line Metro Train With My Friends Hamza Aleem, Ahsan Aleem & Amir Khan.
In This Video, You can See Short Coverage Of Station Entrance, Purchasing Tickets & Coverage Of Elevated & Underground Station Platform. Arrival & Departure Of Trains & Get Off The Train & Station.
Introduction Of Orange Line Metro Train:
Orange Line is an automated rapid transit system in Lahore, Pakistan. Its Pakistan's first metro train since the Karachi Circular Railway which had closed its operations during 1999. The line spans 27.1 km (16.8 mi) with 25.4 km (15.8 mi) elevated and 1.72 km (1.1 mi) underground. The line is served by 26 stations and is expected to handle 250,000 passenger daily. Orange Line trains are each composed of five wagons (with 4 doors each used) manufactured by China's CRRC Zhuzhou Locomotive, and automated and driverless. The maximum speed of the trains is 80 km/h (50 mph). But During My Journey maximum speed of the train is 73 km/h. The Orange Line's jointless track circuits. Track is standard gauge at 1435mm.The trains powered by a 750-volt third rail.
It is a part of the wider CPEC China Pakistan Economic Corridor, the Orange line is being financed by both the Government of Pakistan, and Government of China.
History:
Construction works on the project began in October 2015. CRRC Zhuzhou Locomotive rolled out the first of 27 trains for the metro on 16 May 2017. 1st Testing and trial runs began in March 2018. On 25 October 2020, Orange Line Train was inaugurated & Open For Public. The project cost is Almost USD 1478.18 Million
Details:
Date: 27 October, 2020
Time: 09:45 AM To 11:16 AM
Train Name: Orange Line Metro Train
Train Route: Dera Gujran-Ali Town
Place: Lahore, Punjab
Ещё видео!