The wind industry was stunned by the Siemens Energy announcement of $1.1B in unexpected costs to correct design issues with Siemens Gamesa onshore turbines. All the OEM engineering groups are under extreme pressure to control costs while delivering exceptional turbines. Joel, Rosemary and Allen discuss the Siemens Gamesa issues and how engineering organizations can be successful in difficult times.
THANKS FOR WATCHING THE UPTIME WIND ENERGY PODCAST
Apple Podcast: [ Ссылка ]
Spotify: [ Ссылка ]
Overcast: [ Ссылка ]
CONTACT US TODAY
--
✅ Sign Up for Uptime Tech News (our email podcast updates): [ Ссылка ]
🚨 Follow Rosemary's YouTube Channel: [ Ссылка ]
⚡⚡CONNECT WITH WEATHER GUARD LIGHTNING TECH
👉If you need retrofit lightning protection for wind turbine blades, call or email us:
WEBSITE: [ Ссылка ]
LINKEDIN: [ Ссылка ]
TWITTER: [ Ссылка ]
SUBSCRIBE ON YOUTUBE: [ Ссылка ]
Ещё видео!