Andun provided temporary works designers for an award-winning demolition project at London Waterloo railway station.
The demolition contractor who were tasked to remove; a steel trussed footbridge, a 30’ glazed wall, various lifts/escalators as well as a large portion of the elevated platform structure that used to serve the Eurostar until 2007.
These demolition operations required significant temporary works which included heavy-duty propping to support loads of over 100tonne.
Ещё видео!