#SitaramaLiftIrrigationProject,#MeghaEngineering,#MEIL
Work progress of Sitarama Lift Irrigation Project - PKG 1 as of May 2020 | MEIL |
--------------------------
Seetharama Lift Irrigation project works are continuing on a fast track basis
- The project designed to lift the Godavari water from upper
Dummugudem dam
- The project designed with 5 pumping stations and 4 balancing
reservoirs.
- This project will draw 9000 cusecs of water from Godavari river.
- The project will supply irrigation water for 6.74 lakh acres in
Khammam, Bhadradri Kothagudem and Mahaboobabad districts.
- Head regulator construction has taken up at Dummugudem dam.
- Project designed to utilise 70.40 TMC of water through approach
channel
- Approach channel is one and a half times larger than the required
level.
=============
► Subscribe to: [ Ссылка ]
► Like us on Facebook: [ Ссылка ]
►website: [ Ссылка ]
-----------------------
Megha Engineering & Infrastructures Limited (MEIL) is a major infrastructure company headquartered in Hyderabad, India. The company was established in 1989 as a small fabrication unit. In due course of time, the unit made a name for itself. We are fired by the zeal to equip the country with an engineering and infrastructure foundation that can hold up its pillars for generations to come. ||
Ещё видео!