Recorded on 06/12/2024
-Train Details
C151 (115/116) (Batch 2)
Build By: Kawasaki Heavy Industries & Nippon Sharyo
Year Build: 1988
Year Entered Service: 1988
Year Refurbished: 2008
Traction Control: GTO Chopper (Mitsubishi Electric)
Train Number: 330
Destination: Pasir Ris
Due to track works to integrate the East Coast Integrated Depot Reception Track 3A(RT3A) to the mainline, they won’t be any train service between Tampines and Tanah Merah between 07/12/2024 and 10/12/2024.
This is the very last day before the new crossover would be installed to connect RT3A to the mainline.
If you like to use this video or have any enquire you can send me an email:
singaporetrainschannel@gmail.com
Follow me on Instagram:
[ Ссылка ]
Ещё видео!