In This Video we see the Brand New Emergency One Zero Emissions Pumping Appliance (ZEPA) on a Volvo Chasis Responding through Parliament Square on a Driver Training Run using Blue Lights, Sirens and a Blip of Bullhorn.
This Trial Appliance will be based at Hammersmith Fire Station in West London and is the First of its Kind to be trialled by London Fire Brigade.
The electric-hybrid fire engine is expected to carry out most of its operations on electric power alone, but has a small petrol engine that can extend the life of its battery.
It has a range of more than 200 miles and can pump water continuously for four hours
Nicknamed ZEPA1 the Zero Emissions Appliance will hit the roads later this year.
ZEPA1 / E1 Electric Hybrid Volvo Pumping Appliance \ LK72DND
Camera Used: Sony AX53 Handycam 4K
Filmed in Parliament Square, Central London UK
Ещё видео!