#VANDEBHARAT #PATHANKOT #KATRA
Vande Bharat Express , also known as Train 18, is an Indian semi-high speed intercity electric multiple unit. It was designed and built by Integral Coach Factory (ICF) at Perambur, Chennai under the Indian government's Make in India initiative over a span of 18 months. The unit cost of the first rake was given as ₹100 crore (US$14 million), though the unit cost is expected to go down with subsequent production. At the original price, it is estimated to be 40% cheaper than a similar train imported from Europe. The train was launched on 15 February 2019, by which date a second unit will have been produced and readied for service. The service was named 'Vande Bharat Express' on 27 January 2019
22439/22440 VANDE BHARAT RUNS BETWEEN NEW DELHI AND SHRI MATA VAISHNO DEVI KATRA RAILWAY STATION. IT RUNS ON ALL DAYS EXCEPT TUESDAY
IT CONSISTS OF 14 CHAIR CAR AND 2 EXECUTIVE CHAIR CAR
FOOD IS OPTIONAL IN THIS TRAIN. IT DEPARTS NEW DELHI AT 6 AM AND REACHES KATRA RAILWAY STATION AT 2 PM SAME DAY. 22440 DEPARTS KATRA AT 3PM AND ARRIVE NEW DELHI AT 11 PM. IT HALTS AT AMBALA CANTT, LUDHIANA RAILWAY STATION, JAMMU TAWI RAILWAY STATION IN BOTH DIRECTIONS.
ABOUT PATHANKOT CANTT RAILWAY STATION- Pathankot Cantonment railway station (station code: PTKC) is located in Pathankot district in the Indian state of Punjab and serves Pathankot .
Chakki Bank Railway Station was renamed Pathankot Cantonment Railway Station in 2013.
The 107 km (66 mi) long 1,676 mm (5 ft 6 in) wide broad gauge Amritsar-Pathankot line was opened in 1884
The 164 km (101.9 mi) long 762 mm (2 ft 6 in) wide narrow gauge Kangra Valley Railway from Pathankot to Joginder Nagar was commissioned in 1929
The line from Jalandhar City to Mukerian was constructed in 1915.[4] The Mukerian-Pathankot line was built in 1952.[5] The construction of the Pathankot-Jammu Tawi line was initiated in 1965, after the Indo-Pakistani War of 1965, and opened in 1971
Ещё видео!