Wise Floor Standing Auto Lift Up Noodle Cooker Installation, Assembly & Operation
Installation and Assembly Instructions
➡️Place the float protector in the right position.
➡️Place the protection cover following the right position.
➡️Place the both trays properly.
➡️Place the hanger and follow with the basket.
Operation Instructions
➡️Turn on the inlet valve.
➡️Fill the equipment tank with water.
➡️Fill until the min/max level followed by the indicator at the side.
➡️Press the switch to turn on the machine.
➡️Press the automatic lifting rod/button to lower it ; the timer starts counting down.
➡️When the time is finished the lifting rod will rise up automatic.
➡️It also can automatic lift down by pressing the channel button.
➡️Cancel the operation by pressing the lifting rod/channel button; the lifting rod rises automatically.
Settings Instructions
➡️There are four timers that can be set for each rod.
➡️To set the timer, long press the channel button, until the digital timer is flashing.
➡️Use the up/down button to change the timer.
➡️Long press the channel button to save the timer.
➡️Press the automatic lifting rod/button to lower it ; the timer starts counting down.
➡️When the time is finished the lifting rod will rise up automatically.
⏱ Time Stamp :
0:00-0:11 Introduction
0:12-0:15 Attention
0:16-1:42 Installation and Assembly
1:43-3:02 Operation
3:03-4:34 Settings
4:35-10:08 System Program
10:09-10:18 Ending
📲Please contact us for further assistance
Email : sales@fnbequipment.com.my
Equipment link: [ Ссылка ]
🌐Connect with us :
Website: [ Ссылка ]
Facebook: [ Ссылка ]
Instagram: [ Ссылка ]
#Fnb #FnBEquipment #technology #KitchenEssentials #BusinessUpgrade #Food #Restaurant #Cafe #Bar #CentralKitchen #Cafeteria #foodproduction #machine #kitchen #equipment #cleaning #maintenance
Ещё видео!