Last week our great GroundPlug team was in Birmingham installing one of our Twister steel foundations for a 2 x 8,5 m sign
GroundPlug was chosen especially for this job because the soil capacity were so difficult that a concrete foundation would have have required a digging depth of 6 meters.
GroundPlug installed the foundation beam structure for the sign in just 1 day with minimal digging and a solid foundation where the sign could be mounted the very same day.
Follow our channel to see more interesting Structural Engineering solutions
Ещё видео!