Solve Problems on Control charts for variables by using-
1. Control charts for sample means ( x bar chart)
2. Control charts for sample ranges ( R chart)
A quality inspector took 5 samples each with four observations (n=4) of the length of time for glue to dry. The analyst computed the mean of each sample and then computed grand mean. All values are in minutes. Use this information to obtain 3 sigma control limits for mean of future times . It is known from previous experience that the standard deviation of the process is 0.02 minute.
A company manufactures screws to a nominal diameter 0.500+- 0.030 cm. Five samples were taken randomly from the manufactured lot and 3 measurements were taken on each sample at different lengths. The readings are shown in table.
Calculate Co trolley limits on x bar and R chart and draw the chart .
[ Dayalbagh Edu. Institute Agra BBM May, 2010 ]
Please refer my following Playlists , Links are given:
1. Theory of Machines or Kinematics of Machines play list
[ Ссылка ]
2. Fluid mechanics and Hydraulic machines playlist
[ Ссылка ]
3. Refrigeration and air conditioning playlist
[ Ссылка ]
4. Renewable Energy engineering or Non-convensional energy sources play list
[ Ссылка ]
5. Dynamics of Machinery play list
[ Ссылка ]
6. Engineering graphics or Engineering drawing play list
[ Ссылка ]
7. Engineering Mechanics Playlist
[ Ссылка ]
8. Power plant engineering play list
[ Ссылка ]
9. Engineering Thermodynamics play list
[ Ссылка ]
10. Heat and mass transfer play list
[ Ссылка ]
11. Operation research play list
[ Ссылка ]
12. Strength of material playlist
[ Ссылка ]
13. Control Engineering/ Control systems engineering playlist
[ Ссылка ]
Ещё видео!