Design and construction of two MRT tunnels - 1,100 m bored tunnels with an internal diameter of 5.8 m, two cross passages and 135 m of cut-and-cover tunnels;
Design and construction of a new underground station including station entrances, subway links, architectural finishes and external landscaping.
This project forms part of the overall Downtown Line Stage 2 (DTL2) scheme to link commuters from the Bukit Timah corridor to the North East Line, North South Line and Circle Line, connecting the north western part of Singapore to the Marina Bay area.
Ещё видео!