Banihal Qazigund Road Tunnel || NH44 Banihal to Qazigund || MJ Ali Official
#MJAliofficial
Banihal Qazigund Road Tunnel
-------------------------------------
Banihal Qazigund Road Tunnel is a 8.45 km (5.25 mi) road tunnel at elevation of 1,790 m (5,870 ft) in the Pir Panjal range in the Indian Union Territory of Jammu & Kashmir connecting Banihal and Qazigund. The tunnel reduces the distance between Srinagar and Jammu by 16 km. It also reduces travel time from 2-3 hours to 15 minutes.
It is a Twin tube tunnel consisting of two parallel tunnels - one for each direction of travel. Each tunnel is 7 m (23 ft) wide and has two lanes of road. The two tunnels are interconnected by a passage every 500 m (1,600 ft) for maintenance and emergency evacuation. The tunnel will have forced ventilation for extracting smoke and stale air and infusing fresh air. It will have state of the art monitoring and control systems for security. Built at a cost of Rs. 2,100 crore, it is expected that vehicles will have to pay a toll to use the tunnel.
Construction of this tunnel started in 2011 along with the project to widen NH 44 (which was known as NH 1A before all the national highways were renumbered in the year 2010) to four lanes. The existing road tunnel below the Banihal pass (Jawahar tunnel), has been a bottleneck on the road due to its elevation of 2,194 m (7,198 ft) and limited traffic capacity. The new tunnel's average elevation at 1,790 m is 400 m lower than the existing Jawahar tunnel's elevation, which would make it less prone to avalanches. When completed, the tunnel would reduce the road distance between Banihal and Qazigund by 16 km (10 mile).
Your Queries;
-----------------
1. Banihal Qazigund Road Tunnel Opening Date,
2. Banihal Qazigund Road Tunnel map,
3. Banihal Qazigund Road Tunnel latest news,
4. Banihal Qazigund Road Tunnel inauguration date,
5. Banihal Qazigund Road Tunnel name,
6. Banihal Qazigund Road Tunnel length,
#NationalHighway44
7. NH44 Udhampur to Ramban,
8. NH44 Chanderkote to Ramban in progress,
9. NH44 road construction work resumes,
10. NH44 Road construction work at full swing,
11. NH44 Road construction deadline 45 days,
12. NH44 Kunfer Nalah Tunnel,
13. NH44 at Dhalwas,
14. NH44 at Peerah,
15. Chenani Nashri Tunnel,
16. Qazigund Tunnel,
17. NH44 Road construction from Ramban to Banihal,
18. NH44 Road construction work from 19. Udhampur to Ramban;
20. NH44 Road construction by Gammon Company,
21. NH44 Road construction by Nagar Singh,
22. Banihal Qazigund Road Tunnel,
23. Banihal Qazigund Tunnel,
24. India Road Construction,
25. National Highway 44,
Ещё видео!