This is footage of a Pendu Railway Tie Inspection and Plating System. Ties are first trimmed to size on a trim saw, then move through a kerf saw, making a kerf line for track line side alignment. Ties then move through a stamper, then on through a drill station (not turned on in this video). The ties are then sent through an incisor and then move to the plater. Finally, ties move down the line to a multi-level sorting system.
Ещё видео!