In many engineering construction, it is necessary to have certain requirements for subgrade bearing capacity. When encountering such a large area of muddy land, many people think of replacement construction, but it will consume too much financial and material resources. In this regard, the soil stabilization system provided by Yichen company can directly solidify the existing sludge soft soil in situ without cumbersome replacement construction. The soft soil subgrade can be solidified, so that the bearing capacity of the subgrade can meet the requirements of road technical indicators, which not only solves the problem that the sludge can not be treated, but also saves a lot of financial and material resources.
Ещё видео!