There are great scenarios and there are epic ones. The Fully Fueled scenario is one of the all time greatest. "All" you have to do is couple a pair of GP38-2s diesel electric locomotives to the end of an almost 5,000-tons intermodal train, take over control of the two SD40-2s diesel electric locomotives at the front end and run this beauty up Sand Patch Grade, where you stop the train in the decent, uncouple the helpers and store them at a siding.
The challenge especially comes in when stetting up the four locomotives for working together and then chasing yellows uphill because of another train just in front of you. Doing this (as always) without the HUD, requires some track knowledge, so that you know behind which bend the potentially red signals are.
Included is a short condensed tutorial for setting up leading and trailing locomotives at the front and rear end of the train (35:32).
Quick Access:
00:00 – Start
01:45 – Scenario start
02:48 – Pair of GP38-2s setup for going by itself
05:12 – Role of engineer on rear lead loco discussed as opposed to distributed power
07:44 – Coupling to rear end of train
09:12 – Pair of GP38-2s setup for helper duty (according to game prompt)
10:13 – Additional helper pair setup (recommended)
11:35 – Walk to front end of train while AI trains overtaking and passing
14:20 – Distance display anomaly discussed
14:35 – Pair of SD40-2s setup for front end duty
21:21 – Starting train at Cumberland Terminal
24:45 – Multi-unit mode on front end pair discussed
25:44 – Simulated second driver on rear end lead loco discussed
26:35 – Alerter discussed
27:10 – Passing Cumberland area
28:50 – Restricted speed limit discussed
30:23 – First whistle board before level crossing (14L pattern)
32:38 – Stop at red dwarf signal (exit signal)
35:32 – Setup of leading and trailing locomotives at the front and rear end tutorial
44:45 – Starting train after signal having turned to Restricted (red over lunar)
47:25 – Accelerating to 20 mph after having cleared interlocking
54:45 – Accelerating to line speed 35 mph, then towards 50 mph after passing Clear signal (green)
1:03:30 – Full throttle uphill at Clear signal
1:06:18 – Passing Approach Medium signal (yellow over green)
1:08:45 – Passing Approach signal (yellow over red)
1:12:45 – Approaching next signal, prepared to stop (signals 1)
1:14:15 – Accelerating after recognizing next signal as Approach (signals 1)
1:16:00 – Passing bridge at Hyndman, entering the Grade
1:24:15 – Approaching next signal, prepared to stop (signals 2)
1:25:25 – Accelerating after recognizing next signal as Approach (signals 2)
1:29:12 – Landmarks on way to next signal discussed
1:34:02 – Distinguishing GP38-2s from SD40-2s from the outside
1:35:35 – Passing next set of signals at Approach (signals 3)
1:37:57 – Approaching and running through short tunnel after Fairhope
1:45:20 – Approaching next signal, prepared to stop (signals 4, close to Foley Overlook)
1:47:30 – Accelerating after recognizing next signal as Approach (signals 4)
1:53:35 – Passing Glencoe
1:54:55 – Passing next set of signals at Approach (signals 5)
2:02:18 – Passing next set of signals at Approach (signals 6)
2:06:35 – Whistle board facing wrong direction
2:11:05 – Passing next set of signals at Approach Medium (signals 7)
2:13:25 – Running through 180° degrees curve
2:16:50 – Approaching and passing Mance
2:22:30 – Passing next set of signals at Approach Medium (signals 8)
2:25:10 – Approaching and running into Sand Patch Grade tunnel
2:28:30 – Leaving Sand Patch Grade tunnel, passing next set of signals at Approach (signals 9, close to summit)
2:29:50 – Passing summit sign
2:30:05 – Process of grading discussed and executed
2:32:59 – Stopping train in descend
2:38:30 – Walking back to helper pair
2:42:00 – Setting up helper pair for going by itself
2:42:55 – Uncoupling helper pair
2:43:12 – Reversing helper pair back up to the summit
2:46:30 – Stopping and going forward again, passing Medium Clear signal (red over green over red) before switching tracks
2:48:20 – Passing Restricting dwarf signal (red over lunar) before going into siding
2:50:20 – Shutting down and leaving loco
2:51:23 – Train spotting point at Sand Patch Summit visited
2:52:03 – Conclusion
Broadcasted live on Twitch -- Watch live at [ Ссылка ]
Ещё видео!