On January 16, 2024, a tunnel stop log was blasted at the JC Boyle dam, one of the four dams being removed for the Klamath River Renewal Project. This blast initiated a drawdown for the JC Boyle reservoir. All the remaining dams will be removed by the end of 2024, opening up over 350 miles of spawning habitat to wild salmon.
Contractor: Kiewit Corporation
Blast Contractor: Mc Donegan drilling and blasting
Owners rep: McMillen Corporation
Owner: Klamath River Renewal Corporation
Film Production: Swiftwater Films
Camera: Go Pro Hero 11
This documentation is part of a 6-year independent feature film about the Undamming of the Klamath River and the 20-year campaign behind it. Our productions are made possible through grants and private donations.
Tax-deductible donations are available through The Redford Center if you are interested in supporting this work.