Course - CEE 204 Civil Engineering CAD and Surveying
Title: Height of Collimation method for calculating Reduced Levels
The present video is prepared for the 2-year undergraduates in the Civil and Environmental Engineering Department.
Content:
00:00 Content
00:13 Table columns
00:43 Calculation of Initial Reduced Levels
02:35 Check
*There is typo error in 03:07. The sum of FS is "+" to the sum of RLs except first.
03:54 Calculation of levelling misclosure
04:16 Calculation of allowable misclosure
04:28 Adjustment
04:43 Calculation adjusted Reduced Levels
Check calculation of RL with Rise and Fall method - [ Ссылка ]
-
Civil and Environmental Engineering Department
School of Engineering and Digital Sciences
Nazarbayev University
Ещё видео!