GENERAL INFORMATION: Second part of Rail Baltica Raplamaa section II from the future Keila river railway bridge to within sight of Purila quarry and the future location of Röa ecoduct (Pk 2+100 - Pk 5+700) or about 3,6 km. Flight with Mavic 3 at an altitude of 40 meters.
LANDMARKS: Start at the beginning of future Keila river railway bridge, followed by the crossing of Tallinn-Rapla-Türi road or the future location of Mälivere viaduct. Moving on and crossing existing 1520 gauge railway track or the future location of Pureva railway viaduct. This is followed by the future Röa ecoduct for both 1520 and 1435 gauge railways, where the flight terminates.
CURRENT WORKS: Clearing and stump removal still in progress, topsoil striping and land melioration in progress.
Ещё видео!