Moon Gate developer Cameron Fraser summaries the last month of progress on the construction site. Work progresses on the generator’s robust enclosure, plus the electrical switch room, sewage plant, potable water pumping room and potable water cistern. Another critical piece of infrastructure on its way to Antigua is our reverse osmosis plant, two extraction wells are currently being drilled to supply sea water to the reverse osmosis plant; one thing we never run short of is seawater. The swimming pools have been excavated, the reception and lobby foundation cast, and the main retaining wall for the restaurant and public areas is well under construction.
The first floor of Building 5 has now been completed and block work commenced. Exterior plastering is finished on Building 2, and ground floor columns and lintels continue on Buildings 6 and 7.
Moon Gate Hotel & Spa, Antigua is an exclusive 49-suite, all-inclusive Caribbean resort located at Half Moon Bay, one of the most stunning beaches in Antigua with captivating views of the bay.
[ Ссылка ]
Ещё видео!