In this episode of Project Pilehouse, Matt continues his mission to chop and lower the top for a 1950 Dodge Truck. Matt fabricates the new door pieces to fit under the newly lowered top using Eastwood's MIG 175, TIG 200DC, among other hand tools.
LINK TO BUY TIG200DC: [ Ссылка ]
LINK TO BUY MIG175: [ Ссылка ]
LINK TO BUY Pinch Weld Clamps: [ Ссылка ]
In this episode of Project Pilehouse, Matt continues his mission to chop and lower the top for a 1950 Dodge Truck. Matt fabricates the new door pieces to fit under the newly lowered top using Eastwood's MIG 175, TIG 200DC, among other hand tools.
For the full story and to watch for updates follow along on the blog: [ Ссылка ]
Check out other videos where we repair the doors, lengthen the bed, install air bags and fabricate running boards.
Ещё видео!