Contents:
00:00 Introduction
00:17 Progress
01:39 Drone circuit of the construction site
04:43 This episode vs last episode
Full disclosure: I have no relationship with The Hills Shire Council other than as a rate payer.
Use this link to download very high resolution maps of the construction site over various dates:
[ Ссылка ]
In the past three weeks work has progressed in these areas:
1. The roof above the lobby and Multi-Purpose Rooms is in place.
2. Work has started on the roof above the Café.
3. Work is progressing on the Indoor Leisure Pool.
4. Work is progressing on the Warm Water Programme Pool.
5. Water has been drained from the 25m Pool.
Use this like to see all the episodes I've produced so far:
[ Ссылка ]
Waves Aquatic Centre Google Maps location
[ Ссылка ]
The Hills Shire Council's Waves Aquatic Centre Upgrade Masterplan (including future enhancements)
[ Ссылка ]
View the Waves Aquatic Centre Upgrade Concept Drawings
[ Ссылка ]
Mayor of the Hills Shire Dr Michelle Byrne discusses the construction tender awarded for the redevelopment of WAVES and provides details on the approved concept plan.
[ Ссылка ]
Ещё видео!