smartcare Damp Block 2K Waterproofing Asianpaints Application Video Full Details
Smartcare damp proof Waterproofing | Roof Cooling system Asianpaints
[ Ссылка ]
Apex Ultima Protek Duralife Base Coat Paint | How To Apply Painting Exterior Walls Lamination Paint
[ Ссылка ]
DAMP SHEATH Water Proofing SmartCare Asianpaints Application | Interior Walls | How to Painting
[ Ссылка ]
SmartCare DAMP SHEATH Water proofing application | Exterior Walls | Asian paints
[ Ссылка ]
SmartCare EPOXY TRI BLOCK (Asian Paints) application
[ Ссылка ]
Smartcare Damp proof and Roof tape application
[ Ссылка ]
DIRECTION OF USE:
Surface Preparation : -
• Surface under treatment should be strong enough, clean and free from any loose paint, dust or grease. Remove old paint, putty or existing POP uning chisel, wire brush.
• In case of efflorescence, cement plaster should be removed from the affected areas up till the brick level.
• Prior to application the surface must be in Saturated Surface Dry (SSD) condition.
MIXING : -
Add powder to liquid (2 parts powder & 1 part liquid) slowly under stirring. In case of bulk volume use mechanical stirrer. Mix the entire quantity until get the smooth homogeneous slurry withut lump is achieved Keep the slurry undisturbed for 5/6 minutes to rolease entrapped air during mixing.
Application : -
• Apply SmartCare Damp Block 2K slurry by brush or roller over SSD masonry /brick surface. Allow the 1st coat to dry for 4-6 hrs (Drying depends on ambient temperature) and then apply 2nd coat. But remember 1st coat & 2nd coat must be applied in crosswise direction for better results.
Achieve a coverage of 15 sq.ft./kg/coat.
• In case the cement plaster is removed prior to the application, an overlay of cement plaster must be done within 24 to 48 hrs. For screeding use Asian Paints Smartcare Vitalia an integral waterproofing compound.
Precautions & limitations : -
• Do not add water to SmartCare Damp Block 2K during mixing/application
• At least 3 to 5 days curing is required
• Do not cure by flooding with water or conduct any ponding test before it gets completely cured
• In case of fresh concrete / masonry subsirato the surface must be cured for 28 days before application
• Overlaying of cementations screed/plaster must be done within24 to 48 hrs.
#Smartcare damp proof, Smartcare #dampblock 2K, Smartcare paint, #Waterproofing paint, Wall waterproofing, Wall waterproofing apply, Home painting Tamil, Painting detail Tamil, Asian paints damp black, #Asianpaints damp black water proof work, #Dampblack2K , Damp black 2K water proof work, Water proofing work, Interior waterproofing work, Asian, Home construction, #Polymer , #Building , Waterproofing, #Acrylic , Damp block
Ещё видео!