In August 2021, Concrete Canvas CC8 GCCM was used to provide erosion protection on a crest drainage channel along the railway line between Yeovil and Crewkerne.
The Yeovil to Crewkerne line runs through a steep cutting that was being eroded by surface water run-off from adjacent farmlands. Previously a channel had already been installed to prevent water run-off from eroding the cutting, however over time, it had become heavily overgrown with vegetation.
A number of channel-lining alternatives were considered. However, it was decided by Network Rail and QTS to install CC8 due to the speed and ease of installation.
Find out more on our website: [ Ссылка ]
Ещё видео!