Take a glimpse into Olsson's Station Service Modernization Project for the U.S. Army Corps of Engineer's McNary Lock and Dam.
In May of 2014, Olsson Industrial Electric was awarded a prime contract to modernize the station service electrical distribution system at the McNary Lock and Dam. Over the course of four years, nearly all of the existing 4160V distribution will be replaced. Construction will begin with two iso-phase bus taps feeding new 15kV switchgear assemblies for redundant distribution to new 480V substations. Twenty-eight 4160V governor oil pumps will be rewound to 480V for compatibility with the new station service distribution.
Ultimately, the modernization will convert the entire powerhouse to a redundant 480V system. With the majority of new equipment installed in green field locations, the new system can be commissioned and energized in advance to minimize outages and disruptions to the plant. OS Engineering and Olsson Controls will provide significant support throughout the project making this a complete team effort.