This Pro-Build video provides a walk-through of the electronics installation and is supplementary to the written instructions in this section. Be sure to reference the written instructions as they contain the correct cable lengths and sensor installation procedures for your specific machine.
Avid CNC PRO Assembly Instructions:
[ Ссылка ]
Avid CNC PRO Assembly Instructions - Section 7: Motor & Sensor Connections:
[ Ссылка ]
-----
Featured Products:
Avid CNC Pro Machine: [ Ссылка ]
Peperl + Fuchs Proximity Switch Kit: [ Ссылка ]
Plug and Play Spindle & VFD - [ Ссылка ]
Cable Labels: [ Ссылка ]
-----
Additional videos:
Pro-Tip: Proximity Sensors - [ Ссылка ]
-----
Stay in the loop via our Connect Site and follow us on social media:
Connect Page: [ Ссылка ]
Instagram: [ Ссылка ]
Facebook: [ Ссылка ]
00:00 - Intro
00:21 - Proximity Sensor Kit
00:56 - Motor, Sensor, and Sensor Flag Locations
02:04 - Labeling the Motor & Sensor Cables
03:36 - Installing the Proximity Sensors
06:06 - Motor & Sensor Cable Flow
08:47 - Motor & Sensor Cable Flow
12:15 - Spindle Cable & VFD Installation
12:58 - Cable Management
Ещё видео!