Timestamps:
• Test Operation Steps @ 02:25
• Precautions to consider BEFORE starting Test Operation @ 03:15
• What happens during the Test @ 07:03
• Test Operation Completion @ 08:40
• Test Failures @ 11:48
In this video I'll be showing you how to start the Test Operation procedure on Daikin VRVS / VRV Life systems. As discussed many times on this channel, VRF equipment requires a self diagnostic test to be performed prior to operation. It's not a mini-split, you cannot just turn on the thermostat and operate the equipment in heat or cool. A Test must be conducted first.
We'll also discuss some very important precautions to consider before you start the test. These things get missed all the time resulting in much more time on site to get the system operational.
It is also important to understand what the test does, what it checks for, and more specifically what it does not check for. There will be things you need to do when the test completes, which we will also cover in this video.
Disclaimer:
This is not a training, nor is this a factory authorized or sponsored class. I wanted to break down from experience some of the meat and potatoes, the important Do's and Do-Not's when designing and installing Daikin VRVS systems. My goal is to share the information I've learned over the years, and help share/translate some of the information from the installation and operation manuals that's often overlooked, thrown away, or simply not understood. Through these videos my hope is that I can help make your installation go a little smoother.
Follow me on Twitter for regular posts and updates throughout my week and between posting videos - @InverterAlways
Support the Channel through PayPal @InverterAlways
#Daikin
#DaikinStartup
#DaikinInstall
Thanks everyone for watching! I hope you all have an awesome day!
Ещё видео!