8x4 Dongfeng Kinland truck mounted 14 ton 16 ton XCMG crane installation configuration:
XCMG's 16-ton five-section straight-arm crane, the crane is installed in the middle position, the crane is full rotation, the lifting weight is 16 tons, the working half is 18.5 meters and 7.5 tons; the working radius is 7.8 meters, the lifting height is 9 meters, and the lifting weight is 2.3 tons; Working half 15.8 meters; lifting height: 11 meters; lifting weight: 3.1 tons; working radius: 13.2 meters; lifting height: 14 meters; lifting weight: 1.8 tons; working radius: 15.8 meters; lifting height: 16.3 meters; lifting weight: 1.6 tons; working radius: 18.5 meters; lifting The lifting height is 19 meters and the lifting weight is 1.2 tons.
8x4 Dongfeng Kinland truck mounted 14 ton 16 ton XCMG crane maintenance
1. The chassis is maintained at the local station according to the after-sales manual. The bodywork is based on the product operation and maintenance manual provided by the manufacturer. It is the necessary information for the crane operator to operate the equipment. Before operating the machine, be sure to read the operation and maintenance manual of the crane and perform operation and maintenance according to the requirements of the manual.
2. Keep the crane truck clean for a long time, and adjust and tighten loose parts in time to prevent the loose parts from aggravating the wear of the parts or causing the parts to be lost. 3. Pay attention to the work load during the running-in period of the crane. Generally, the work load during the running-in period should not exceed 80% of the rated work load, and the crane should be arranged with a suitable workload to prevent the machine from overheating during long-term continuous operation .
4. Operators should pay attention to frequently checking the level and quality of coolant, lubricating oil, brake fluid, hydraulic oil and fuel oil (water), and pay attention to checking the tightness of the vehicle. At the same time, the lubrication of the lubrication points of the crane should be strengthened. It is recommended that grease be added to the lubrication points during the running-in period (except for special requirements).
5. Pay attention to frequently observe the indicators of the truck-mounted crane. If abnormalities occur, stop the operation in time to eliminate them, and stop the operation before the cause of the fault is found and eliminated.
6. After the running-in period of the truck-mounted crane is over, the entire vehicle should be maintained compulsorily, and the truck-mounted crane should be inspected and adjusted, and the oil should be replaced. ? The maintenance requirements for the newly purchased truck-mounted crane during the running-in period can be summarized as: load reduction, enhanced lubrication, attention to operation, and attention to inspection. The operator pays attention to the maintenance and maintenance of the truck-mounted crane during the running-in period according to the manufacturer's requirements, which can effectively reduce the impact of the running-in period on the performance and life of the truck-mounted crane