#indianrailways #centralrailway #wdp4d #konkanrailways #10103 #tejasexpress #wap7 #lhb #wcam3 #wdg3a
Location : Ghatkopar
DOC : 24 September 2022
Central Railway (abbreviated CR) is one of the 18 zones of Indian Railways. Its headquarters is in Mumbai at Chhatrapati Shivaji Maharaj Terminus. It has the distinction of operating the first passenger railway line in India, which opened from Mumbai to Thane on 16 April 1853.
Central Railway (abbreviated CR) is one of the 18 zones of Indian Railways. Its headquarters is in Mumbai at Chhatrapati Shivaji Maharaj Terminus. It has the distinction of operating the first passenger railway line in India, which opened from Mumbai to Thane on 16 April 1853.
Main/Long Routes of Central Railway
Mumbai CSMT-Kalyan-Igatpuri-Nashik road-Manmad-Jalgaon-Bhusawal-Akola-Badnera-Wardha-Nagpur
Mumbai CSMT-Kalyan-Karjat-Lonavala-Pune
Mumbai CSMT-Kurla-Vashi-Panvel-Roha
Manmad-Aurangabad-Nanded (south central railway line)
Pune-Daund-Solapur-Wadi-Tandur
Pune-Satara-Sangli-Miraj-Kolhapur
Miraj-Pandharpur-Kurduvadi-Barshi-Osmanabad-Latur-Latur Road
Ballarshah-Majri-Sevagram (formerly Wardha East Jn.)-Nagpur-Amla-Itarsi
Dadar-Solapur-Dadar
One of the oldest and important railway project of central railway zone was kalyan-Ahmednagar railway project which was in planning stage since british regime. It was referred to as 3rd ghat project. The survey of this project was carried out in 1973,2000, 2006, 2014 etc. This project was in pink book in 2010. unfortunately this project could not be started. The alignment length of this project was 184 km and it could have been shortest route for marathwada, andhra and telangana. The major challenge for this project is 18.96 km long tunnel in malshej ghat section.[4] Malshej Kriti samiti is following for kalyan ahmednagar railway project. Kalyan-murbad section which is first phase of this project is already under survey stage.
Ещё видео!