This is the result of a project our team had to do for school. The scope of this project was, to develop a system, which can collect and transport "building material" to the summit station of a cable car. The building materials are: steel beams, bulk
and rocks. These are placed on the Mountain terrain in many different positions. The target is to bring as much building material to the summit station in 3 min. In the beginning, the cable car
must be placed completely in the valley station. The system has to be installed in 2 min. The system must not be heavier than 3.5 kg.
Hope you enjoy it!
Ещё видео!