Project location : Northern Phnom Penh
Project costs : $43 million US dollars, and it is a BOT investment;
Project start date : June 18, 2008 and will be completed middle of year 2010.
The Prek Pnov Bridge is spanning the Tonle Sap river by linking National Road No. 5 from Kob Srov to Road No.6A. The 996 meters Prek Pnov Bridge is invested by and built by LYP Group.
- The bridge is 996 meters long and 14 meters wide linking from Kob Srov Road in Sangkat Svay Pak, Khan Russei Keo, Phnom Penh Capital City (West of Tonle Sab River) to bridge No.6 along National Road No.6A in Muk Kompol district, Kandal Province (East of Tonle Sab River), connecting with, is a 8,170 meters concrete road construction connecting from the East of the bridge to National Road No. 6A;
- The latest inspection indicates that the construction at each site of the bridge has achieved 96% and in the River 97%, currently connecting bridge surface to its body;
- This bridge was officially opened for public during a inauguration ceremony on 20th of September 2010, presided by Samdech Techo Hun Sen Prime Minister of Cambodia and Lok Chumteav.
[ Ссылка ]
Ещё видео!