If we were roughing in multiple buildings on a project, are we required to install a ground rod at each one? Are we required to bond our neutral conductor and grounding conductor at each location as well? In this latest episode of Electrician U, Dustin takes a look into the requirements for each of these to shed some light on the subject.
🤘⚡️EU Learning System⚡️🤘
For Individuals --- [ Ссылка ]
For Businesses --- [ Ссылка ]
-Video courses on every side of the electrical trade (theory, code, safety, wiring, install, troubleshooting, leadership, and more)
-Practice exams for 2017, 2020, 2023 code
-YouTube videos categorized and searchable
-Audio lessons
-Forum
-Business version has admin portal and ability to assign learning to technicians and monitor progress
-Any business size from 2 techs to 2,000!
🎓💡CONTINUING EDUCATION💡🎓
Sign up here --- [ Ссылка ]
-State Approved
-Video Based
✍📝PRACTICE EXAMS📝✍
Get them here --- [ Ссылка ]
-2017, 2020, and 2023 NEC versions
-Online Residential Wireman Exam
-Online Journeyman Exam
-Online Master Exam
-300 Question Online Code Cannon (not license specific, all code)
-Take as many times as you want
-All of the above come with printable PDFs
🎤🎧PODCAST🎧🎤
Spotify:
[ Ссылка ]
Apple Podcast:
[ Ссылка ]
📱👍SOCIALS👍📱
TikTok - [ Ссылка ]
Instagram - [ Ссылка ]
Facebook - [ Ссылка ]
Reddit - [ Ссылка ]
Rumble - [ Ссылка ]
Discord - [ Ссылка ]
🎧🎹Music, Editing, and Videography by Drake Descant and Rob LeBlanc🎹🎧
#electrician #electrical #electricity
Article 250.32 of the 2020 NEC governs buildings or structures supplied by a Feeder or Branch circuits. Under the exceptions to 250.32(A), the code states that a Grounding Electrode is NOT required in a building supplied with a single branch circuit (including multiwire branch circuits) IF that branch circuit includes an equipment grounding conductor. So, if we were supplying a separate building from our main building with a circuit for a light or a receptacle or something like that, as long as we included an equipment grounding conductor with our run.
Feeders are slightly different. Again, article 250.32 covers this, but we will be using part (B) for feeders. If we are supplying this separate building with a PANEL that will provide power for things within it, then we are to install an equipment grounding conductor WITH our feeder, and it needs to also be connected to the Grounding Electrode. In addition, part A of 250.32 does require a grounding electrode system and conductor (we used the EXCEPTION when talking about branch circuits!) to be installed. So, if it’s going to be a brand-new slab, we will be required to install our grounding system just like a normal commercial building would (Ufer, Building Steel, Cold Water, Ground Rod, Etc.). The equipment ground carried in our feeder is used to BOND the parts and the grounding electrode system still must be established!
Article 250.32 (B) also states “Any installed GROUNDED CONDUCTOR (Neutral) shall NOT be connected to the equipment grounding conductor or to the grounding electrode(s). So, this tells us that our neutral and ground should NOT be bonded together at our new building, as it is already bonded together at our service. Remember from previous videos, that Dustin established the bond is needed at ONE point only to complete the loop so that the OCPD can sense a LARGE current flow and trip. But we do not want to establish that bonding point twice and creating a choke point. That complete loop for a ground fault needs to happen RAPIDLY and since there are no motors, panels etc. to give us any resistance or loads to go through, the resulting current flow is massive (but very short lived) allowing the breaker to do its job and trip.
So, to recap, if you are installing a new building from an existing one, you are NOT required to install a grounding electrode if it is fed from a Branch Circuit. We ARE required to install a grounding electrode if it is being fed with a Feeder. And we do NOT want to rebond our ground and neutral at the new building as this bond is already made at the source building.
Is a Ground Rod Needed When Grounding Multiple Buildings?
Теги
electricianelectricalelectricitydustin stelzerelectrician vlogconstructioncommercialresidentialelectrical vlogelectrical courseselectrician courseselectrical classelectrician classelectrician schoolelectrician lifecommercial electricianfrom a journeymanelectrical contractorshould i become an electricianjourneyman tipselectrician examterms of tradepower issuesbonding vs groundingground rod installationsub panels electrical