BrightPink arrives at home, and then BrightBlue parks right next to it!
FEC Special train 141 delivers BrightPink to Workshop B in West Palm, and then BrightBlue returns from testing and pulls up along side. When 141 arrives, we see them open the switch at the far north end of the yard and then switch onto the yard track. Next BrightPink is pulled onto track 1 in the workshop where the GP40 disconnects and then reaches the front of the yard before backing through the shop on track 2.
Once the GP40 is clear, BrightBlue comes north on the main and then also enters the shop from the north on track 2.
Ещё видео!