The Statue of Unity is the world's tallest statue, with a height of 182 metres (597 feet),[3] located near Kevadia in the state of Gujarat, India. It depicts Indian statesman and independence activist Vallabhbhai Patel (1875–1950), who was the first deputy prime minister and home minister of independent India and an adherent of Mahatma Gandhi. Patel is highly respected for his leadership in uniting 562 princely states of India to form the single Union of India. The statue is located in Gujarat on the Narmada River in the Kevadiya colony, facing the Sardar Sarovar Dam 100 kilometres (62 mi) southeast of the city of Vadodara.
The project was first announced in 2010, and construction started in October 2013 by Indian company Larsen & Toubro, with a total construction cost of ₹27 billion (US$422 million).[5] It was designed by Indian sculptor Ram V. Sutar and was inaugurated by the Prime Minister of India, Narendra Modi, on 31 October 2018, the 143rd anniversary of Patel's birth.[6]After studying statues of Patel across the country, a team of historians, artists, and academics chose a design submitted by the Indian sculptor Ram V. Sutar.[a] The Statue of Unity is a larger version of a statue of the leader installed at Ahmedabad International Airport. Commenting on the design, Ram Sutar's son, Anil Sutar explains that, "the expression, posture and pose justify the dignity, confidence, iron will as well as kindness that his personality exudes. The head is up, a shawl flung from shoulders and hands are on the side as if he is set to walk". Three models of the design measuring 3 feet (0.91 m), 18 feet (5.5 m), and 30 feet (9.1 m) were initially created. Once the design of the largest model was approved, a detailed 3D-scan was produced which formed the basis for the bronze cladding cast in a foundry in China.
The total height of the structure is 240 m (790 ft), with a base of 58 m (190 ft) and the statue measuring 182 m (597 ft).[1] The height of 182 metres was specifically chosen to match the number of seats in the Gujarat Legislative Assembly
A consortium comprising Turner Construction, Michael Graves and Associates and the Meinhardt Group supervised the project. The project took 57 months to complete – 15 months for planning, 40 months for construction and 2 months for handing over by the consortium.[23] The total cost of the project was estimated to be about ₹2,063 crore (equivalent to ₹28 billion or US$350 million in 2020) by the Government.[17] The tender bids for the first phase were invited in October 2013 and were closed in November 2013.[24]
Narendra Modi, then serving as the Chief Minister of Gujarat, laid the statue's foundation stone on 31 October 2013, the 138th anniversary of Patel's birth.[25][26]
Indian infrastructure company Larsen & Toubro won the contract on 27 October 2014 for its lowest bid of ₹2,989 crore (equivalent to ₹41 billion or US$510 million in 2020) for the design, construction and maintenance of the statue.[27][28] L&T commenced the construction on 31 October 2014. In the first phase of the project, ₹1,347 crore was earmarked for the main statue, ₹235 crore for the exhibition hall and convention centre, ₹83 crore for the bridge connecting the memorial to the mainland and ₹657 crore for the maintenance of the structure for a duration of 15 years after its completion.[27][28] The Sadhu Bet hillock was flattened from 70 metres to 55 metres to lay the foundation of the statue.[10]
L&T employed over 3000 workers and 250 engineers in the statue's construction. The core of the statue used 210,000 cubic metres (7,400,000 cu ft) of cement and concrete, 6,500 tonnes of structural steel, and 18,500 tonnes of reinforced steel. The outer façade is made up of 1,700 tonnes of bronze plates and 1,850 tonnes of bronze cladding which in turn consists of 565 macro and 6000 micro panels. The bronze panels were cast in Jiangxi Tongqing Metal Handicrafts Co. Ltd (the TQ Art foundry) in China as facilities large enough for such casting were unavailable in India.[29][30][10] The bronze panels were transported over sea and then by road to a workshop near the construction site where they were assembled.[10]
Construction of the monument was completed in mid-October 2018; and the inaugural ceremony was held on 31 October 2018 (143rd birth anniversary of Vallabhbhai Patel), and was presided over by Prime Minister Narendra Modi.[34][35] The statue has been described as a tribute to Indian engineering skills
#shorts #viralshorts #trendingshorts #youtubeshorts
Ещё видео!