Vlog Video: Bow-String Arch Bridge To Bandra-Worli Sealink ! बो स्ट्रिंग ब्रिज से सी-लिंक
From this 21st Sept ,Saturday, the Mumbai Coastal Road will remain operational for vehicular movement all seven days of the week between 7 am and 12 am,
Presenting The First Day the Ride of Bowstring Arch Bridge. Now vehicles on the Coastal Road will be allowed to enter the Bandra-Worli Sea Link directly from Coastal Road Connector Bowstring Arch Bridge from Toay i.e Friday 13th Sept 2024.
Please see below video too:
Worli Seaface Promenade & Beautifull Themed Park Line Video:
[ Ссылка ]
1st DAY DRIVE ON MUMBAI COASTAL ROAD WORLI TO MARINE LINES
[ Ссылка ]
3) FIRST DAY DRIVE IN 2nd TUNNEL MUMBAI COASTAL ROAD | Marine Drive To Haji Ali
[ Ссылка ]
It was inaugurated on 12th September by Cm Shinde along with Devendra Fadnavis and Ajit Pawar and is opened for the public from today.
Most Waited Connector Bridge of Mumbai costal Road to Bandra-Worli SeaLink i.e.
Bow-String Arch Bridge Inaugurated by CM Eknath Shinde on 12th September partially opened for Public Access by Today Friday 13th Sep For Northbound traffic via its Southbound Arm.
Meanwhile, those traveling south towards Nariman Point will still need to use the current entry points at Worli and Haji Ali.
In celebration of Ganeshotsav, the Coastal Road will open to vehicles around the clock. From now until September 17, the road will be open to access Day and night.
Post-September 17, after the Anant Chaturdashi festivities, the Coastal Road will revert to its usual operational hours. Traffic will once again be regulated from 7 am to 11 pm.
*********** IGNORE below
Mumbai Coastal Road
Bow-String Arch Bridge
Bandra-Worli Sea Link
Mumbai Traffic
Mumbai Infrastructure
Coastal Road Connector
Mumbai Tourism
Mumbai Coastal Road
Bandra Sea Link Connector
Bow string arch bridge
Urban development
Cityscape
Landmark
Bow-String Arch Bridge Mumbai
Coastal Road Bandra-Worli Sea Link
Mumbai Coastal Road Traffic Improvement
Bandra-Worli Sea Link New Access
Mumbai Infrastructure Projects
Mumbai Tourism Attractions
#MumbaiCoastalRoadOpening
#BandraSeaLinkConnectorInauguration
#BowStringArchBridgeLaunch
#MumbaiNewRoad
#MumbaiNewBridge
#MumbaiTrafficSolution
#MumbaiTourismBoost
#MumbaiDevelopmentUpdate
#MumbaiCityscape
#MumbaiLandmark
#MumbaiPride
#IndiaInfrastructure
#GlobalDevelopment
#UrbanPlanning
#CityLife
#Travel
#ExploreMumbai
#MumbaiDiaries
#MumbaiMoments
#MumbaiVibes
#MumbaiLove
#MumbaiForever
#MumbaiRocks
#MumbaiIsAwesome
#MumbaiMagic
#MumbaiCity
#MumbaiIndia
Many Mumbai infrastructure projects will boost economy like : -
Mumbai Coastal Road Project (MCRP) or
Mumbai coastal road
Mumbai Metro is a rapid transit (MRT)
Mumbai metros
Line 1 (Blue Line) of the Mumbai Metro - fully elevated and consists of 12 stations from Versova to Ghatkopar
Line 2 (Yellow Line) of the Mumbai Metro - The line connects Dahisar in the northwest with Mandale in Mankhurd via Andheri, BKC and Chembur in the east. Phase One of Line 2A was partially opened on 2 April 2022 from Dahisar East to Dahanukarwadi.
Line 3 (Aqua Line) - the first underground metro line in Mumbai - from Navy Nagar in the far-south of Mumbai to Aarey Depot
Mumbai metro line 3
Or
Mumbai Metro line 3: Colaba-Bandra-Seepz Metro
Line 4 (Green Line) of the Mumbai Metro is an under-construction - from Wadala (Mumbai) to Kasarvadavali (Ghodbunder road, Thane) via Chembur, Bhandup Mulund and Teen Hath Naka
Line 5 (Orange Line) - will connect Thane with Kalyan via Bhiwandi, with 17 stations. The line will be fully elevated except for a 3 km underground section in Bhiwandi.
Line 6 (Pink Line) - connect Lokhandwala Complex with Vikhroli
Line 7 (Red Line) - will connect Bhayander with the Chhatrapati Shivaji Maharaj International Airport with 24 stations
Gold Line 8 - Airport Express Line part of the metro system for the city of Mumbai & Navi Mumbai, India. It will serve direct connectivity from CSMIA Airport in Mumbai to NMIA Airport in Navi Mumbai
Red Line 9 (extension) -is an extension of the Red Line from Andheri to CSMIA and Dahisar to Mira Road and it will run on a double-decker bridge
Green Line 10 - Extension of Line 4 (Green Line) - Gaimukh-Shivaji Chowk (Mira Road) corridor , Thane Metro
Green Line 11 - Extension of Line 4 (Green Line) - from Wadala–CSMT
etc and other proposes
Mumbai metro
Atal Setu bridge mumbai or
Mumbai Trans Harbour Sea Link or Mumbai Trans-Harbour Sealink (MTHL)
Airoli katai elevated roads or
Airoli-Katai Tunnel Road
Goregaon Mulund Link Road
Navi Mumbai International Airport (NMIA)
Sewri Worli Elevated Corridor or SWEC
Chheda Nagar Flyover
Dombivli Mankoli Flyover or
Motagaon Mankoli Bridge
Dombivli-Thane Link Road
Bullet Train Mumbai to Ahmedabad or
Mumbai-Ahmedabad Bullet Train Corridor
Mumba Delhi Expressway
Navi Mumbai International Airport
Samruddhi Mahamarg
etc
@India Travel Views (ITV)
LIKE | SHARE | SUBSCRIBE
Ещё видео!