In this video we guide you step-by-step through the correct connection and commissioning of your Triple Power 5,8kWH (“Slave” batteries) + BMS (“Master” batteries) with your SOLAX x3 inverter. From installation and commissioning of the inverter to commissioning of the batteries and all the necessary connections.
Caution: Please follow all the steps in the video, in order, to avoid irreversible damage to your equipment.
Video chapters :
00:00 - Warning
00:10 - Configuration used
00:20 - Phase 1: Checking the package
00:42 - Phase 1: Mounting the inverter wall bracket
01:15 - Phase 1: Preparing and connecting PV cables
03:24 - Phase 1: Powering the Solax X3 inverter
05:12 - Phase 1: First start-up of the Solax inverter
05:49 - Phase 1: Inverter parameterization
05:58 - Phase 2: Unpacking
06:50 - Phase 2: Preparing the MC4 battery cables
07:51 - Phase 2: Master/Slave battery connections
10:58 - Step 2: Dip switch settings according to configuration
11:37 - Phase 2 : Battery switch-on
12:25 - Inverter menu: Battery information