When demolishing buildings, the following measures can be taken to reduce dust and noise:
Measures to reduce dust:
- Sprinkling for dust suppression: Before the demolition work, sprinkle water to moisten the surface of the building and the surrounding roads so that the dust is less likely to fly. During the demolition process, use high-pressure water guns or spraying equipment to continuously spray water on the working surface to suppress the generation of dust.
- Set up enclosures: Set up enclosures not less than 2.5 meters high around the demolition site, and install anti-overflow seats at the bottom of the enclosures to prevent dust from spreading to the surrounding environment.
- Cover with dust-proof nets: Cover the construction waste that cannot be removed temporarily after demolition and the exposed ground with dust-proof nets to reduce dust raised by the wind.
- Vehicle washing: Set up vehicle washing facilities at the entrances and exits of the construction site to wash the bodies and tires of the vehicles entering and leaving to prevent the vehicles from carrying mud on the road and generating dust.
- Use dust suppressants: Spray dust suppressants in the demolition area and on the surrounding roads. Through the effects of agglomeration and adsorption, fix the dust particles on the ground to reduce dust.
Measures to reduce noise:
- Select low-noise equipment: Give priority to selecting new, low-noi