CCTT ([ Ссылка ]) training instructor Mike Pennacchi goes though the LinkWare™ report. After certifying a copper or fiber network, this report is typically provided to the customer. It is critical to understand the results displayed in this report to ensure the cabling was installed properly.
Topics covered include:
• Module calibration dates
• Using current firmware
• Use of proper adapters
• Selecting the correct test limit
• Identifying the cause of failures
• Getting the .flw file at the end of the project
Ещё видео!