00:00. Construction of atmospheric tanks
05:17. Concrete Canvas (CC) Channel Lining
08:05. Manufacturing process of breakwater
10:05. reinforcement of surroundings of manholes
10:47. The production process for X blocs
14:17. Asphalt Reinforcement Geogridn
16:44. The Quay Wall at the new Tema Port Facility is built with “Caissons”
20:07. The process of creating printed concrete surfaces
21:36. The production of wave blocks (50-ton Tetrapods)
29:02. Supersized Clamshell Box Culvert Install
31:42. Precast Concrete Segmental Box Culvert Design
33:43. The concrete pour process
37:48. Concrete canal lining in full section configuration portugal 2007
38:58. Python 5000 Pothole Patcher
41:04. Ravenscraig West Coast Main Line Bridge Construction
44:15. The Saint-Louis/Arzviller inclined plane.
47:09. Pavement treatments and preservation
50:57. The construction of the maritime infrastructure for the offshore extension of Monaco.
Ещё видео!