My videos are usually compressed into 3-5 minute lengths. Just how long does the average ship arrival really take? I figured I wanted to know as well.....I timed this video as they stopped traffic and lifted the bridge, until it lowered again and traffic resumed.
As for how much time I put into each vessel capture ? If anyone is interested I can do a "set up" video.
About the Visit:
Visit # 19 to the Twin Ports this Season!
As per the norm, arriving light, loading Coal at the SMET dock in Superior
They arrived Duluth 8/14/2022 1:38 PM
They departed Duluth 8/15/2022 02:26 AM after spending loading the coal.
Departing with 68k tons of coal, heading to St Clair / Monroe MI to deliver
Info from the Interlake Site:
At 1013.5 feet, Interlake’s flagship M/V Paul R. Tregurtha is the longest ship on the Great Lakes. She can carry up to 68,000 gross tons of taconite pellets or 71,000 net tons of coal. Her unloading system and 260-foot boom empty her five cargo holds in about eight hours. Built by American Ship Building Company at Lorain, Ohio, in 1981, this vessel was first named William J. DeLancey. In 1990, she was renamed Paul R. Tregurtha in honor of Interlake’s Vice Chairman of the Board.
She is the reigning "Queen of the Lakes", a title she has held since she entered service in 1981.
She has an elevator and quite luxurious guest accommodations.
Built for approximately $60 million, she became a flagship for the Interlake fleet.
Carrying Capacity 68,000 Gross Tons
Overall Length 1,013.5
Year Built 1981
Hull Depth 56'
Beam 105'
Engine Horsepower 17,120
Ещё видео!