Shamrock Lake Centre Culvert, constructed in 1938, had not undergone any rehabilitation and needed replacement. Located on Highway 11 in Northwestern Ontario and under 19 m of fill, the design of the replacement culvert posed numerous challenges from all directions. The culvert was relined using a Steel Tunnel Liner Plate, providing the most effective and economical replacement structure.
This webinar will cover design challenges, alternative solutions considered, product details of the steel liner and best practices of constructing the reline structure.
[ Ссылка ]
[ Ссылка ]
[ Ссылка ]
Ещё видео!